A worn surface became a clean, durable lot. The work was done right, on time, and the property looks new again.

The scope of work and timeline

This project required careful planning to minimize downtime for the property. We coordinated with management to schedule work during off-peak hours and completed the job ahead of schedule without compromising quality.

18,500

Square feet paved

14

Days to completion

100%

Insured and bonded

The challenge

The property sat in a busy commercial area with limited windows for work. Tenants needed access during business hours, and any disruption could affect leasing and operations. The existing base had soft spots that required removal and replacement, adding complexity to the timeline.
Our solution
We scheduled the work in two phases to keep the lot partially accessible. Phase one focused on the worst sections, completed during evening and weekend hours. Phase two finished the remaining areas during a planned tenant coordination window. We brought in extra equipment and crew to accelerate the schedule without cutting corners.
The process
Day one began with milling the existing surface to remove the damaged asphalt and expose the base. We inspected the subgrade, made repairs where needed, and prepared the foundation. Days two through five involved laying new asphalt in multiple lifts, compacting each layer to specification. We used a quality mix rated for heavy commercial traffic and applied a seal coat on day fourteen to protect the new surface.
The Result

What clients say

Real feedback from completed projects

The work was done right the first time, no excuses, no delays.
Marcus Chen
Property manager, Atlanta
They showed up when they said they would and finished ahead of schedule.
Sarah Mitchell
HOA president, Brookhaven
Professional crew, clean site, and the surface has held up perfectly.
James Rodriguez
Retail center owner, Dunwoody

Questions

Common questions about this project and similar work

How long does asphalt last?

Quality asphalt typically lasts 15 to 20 years with proper maintenance. Sealcoating every two to three years extends the life significantly. Weather, traffic volume, and drainage all affect longevity.

What maintenance is required?

Regular sealcoating, crack filling, and prompt pothole repair keep surfaces in top condition. We recommend a maintenance plan tailored to your property's traffic and climate exposure.

Is your work insured?

Yes. BIRAN PAVING GROUP carries full liability and workers' compensation insurance. Certificates of insurance are available upon request for all projects.

Do you offer warranties?

We stand behind every job. Warranty terms are detailed in your contract and cover material and workmanship defects within the specified period.

Can you work around my schedule?

Absolutely. We coordinate with property managers and tenants to minimize disruption. Early morning, evening, and weekend work is available for active commercial sites.